
Eight pictures in this post but none of the outside since all of the work for the last couple of weeks has been inside. Running all of the electrical wires, sanding and putting polyethylene on the logs downstairs and installing the pine floors on the 2nd floor which will be the 1st floor ceiling for the 2 bedrooms, the bathroom, utility room, kitchen and diningroom the livingroom
will be open to the ceiling/roof.
No comments:
Post a Comment